GEOSYNTHESIS ENGINEERING

Development and service of drilling fluid

News

«Mente et malleo»

Directional well with vertical deviation - 100 m. Design depth - 5620/5628 м. The well will be drilled with utilization pitless technology.

Please accept our sincere congratulations on the coming New Year and Christmas!
May this year be filled with joyous events and successful undertakings, new plans and bright ideas!
May your partners be reliable, your friends - faithful, and the family - strong and happy!
May the New Year bring you success and the big plans and dreams come true!
Health, warmth, peace and harmony to you and your whole family!

The depth of the well is 3900 m. Penetration of the pay-zones within the interval of 2950-3900 m will be performed with utilization of the clayless drilling mud Biocar®.

The well depth is 4500 m.
Workover operation is performed for exploration of the prospective horizons of 3210-3551 m depth.

Brine preparation was performed on the production support base of our company.

Temporary fluid-loss pill was set on the bottom of the well. It prevented killing fluid loss.

Kyiv, November 8-10, 2016.

Our flushing systems was used on the 250-th wells for 20 years since the first industrial application.