GEOSYNTHESIS ENGINEERING

Development and service of drilling fluid

Killing of the well with abnormally low formation pressures was conducted to replace of emergency tubings.
For prevention of productive reservoir puddle invert emulsion drilling mud Witer II was used as a killing fluid which recommended itself good on previous wells.

Necessary fluid volume for the works was delivered to the field as a lease term.

PARAMETERS OF KILLING FLUID (IEDM WITER II):
  • Density – 1,02 g/сm3;
  • Funnel viscosity – 36 s;
  • Gel – 38/38 dPа;
  • PV – 18 mPа*s,
  • YP – 72 dPa,
  • Filtration loss – 2 сm3/30 min.;
  • Electrical stability - 502 V.