Killing the well was performed for revision of tubings. Pill of blocking fluid with unique composition of organo-mineral colmatants was set to the perforation zone to prevent absorption and preservation of collector properties.
The special fluid was prepared on the territory of our base and was provided to the Operator on a rental basis.

PARAMETERS OF KILL FLUID:
  • Density – 1,10 g/сm3;
  • Funnel Viscosity – 55 s;
  • Gel – 53/67 dPa;
  • PV – 15 cP,
  • YP – 163 dPa,
  • Flitration Loss – 4,5 см3/30 min;
  • рН - 10,31.

Absorption of liquid during the wellkilling was not observed.