Development and service of drilling fluid

Penetration of pay zone was performed with invert emulsion drilling mud Witer-II. After drilling was finished, the slotted-liner was set on the interval (5458 – 5620m).

The inflow was performed by replacing the IEDM, pumping alternately gas condensate and nitrogen. After IEDM was replaced well were stimulated easily. Debit of the well is increasing at the moment. High level of obtaining of production rate is expected.

 

 