GEOSYNTHESIS ENGINEERING

Development and service of drilling fluid

To work on this well have attracted after her killing formation water. Planned some work on stimulation. Something to do with the bombings, and - in pure water. But life has made adjustments - failed to disrupt the packer. I had to drill it. It is understood that in the water it turns bad. They called us - outrigger asked slightly increase capacity and give the system the thixotropic properties.

That's what came out of it:

PARAMETERS OF WASHING LIQUID:

  • Density - 1010 kg/m3;
  • Relative viscosity - 42 с;
  • SNA - 8/12 dPa;
  • Pastic viscosity - 11 mPa*c;
  • CSN - 93 dPa.

Work on the well underway.