GEOSYNTHESIS ENGINEERING

Development and service of drilling fluid

14.09.2004

The first biopolymer system "BIOCAR" was used on the well №545 Bugrovatovskaya, the drilling of the horizontal section of the trunk in the range of 3363 - 3470 m. Photos at the drill. Laboratory NIIKB drilling tool at full strength. From left to right: Sobichenko Anton Vasilyevich, Onishchenko Valentin Petrovich, Duz` Andrey Grigoryevich, Luban Yuriy Vladimirovich, Nakonechnaia Galina Anatolyevna.