GEOSYNTHESIS ENGINEERING

Development and service of drilling fluid

18.02.2017
First utilization of invert emulsion drilling mud Witer II in drilling of reservoir on the interval (4785-4880 m) on the №109 Mehedovka well.

On the picture, left to right: Louban Yuriy Volodimirovich, Korol Nina Oleksiivna,Onishchenko Valenin Petrovich, Agre Maxim Leonidovich, Luban Serhiy Volodimirovich.