GEOSYNTHESIS ENGINEERING
Development and service of drilling fluid
Homepage
Origins
Teachers
How it was
It’s interesting
About company
Productive activity
Production Service Shop
Rent of drilling fluids
Scientific activity
Production
Chemicals for preparation and processing of circulation fluids
Circulation fluid systems
New research projects
Services
News
Library
Abstracts
Our articles
Books
Scientific articles
Contacts
Поиск
Search
Home
Production
New research projects
Lignocross<sup>®</sup> - a fundamentally new clay free system based on lignosulfonate
Lignocross
®
- a fundamentally new clay free system based on lignosulfonate
«Mente et malleo»
NEWS
04.02.2022. Start of Drilling of the Second Exploration Well at the New Field
08.01.2022. The Use of IEDM Witer II while drilling-in the productive interval of the well
05.01.2022. Well killing was performed for well workover operations
31.12.2021. Happy New Year! The Outcomes: Technological Breakthrough Year
16.12.2021. Workover operation of the well by sidetrack drilling method
16.11.2021. Drilling of a directional well has begun at the gas condensate field
12.11.2021. Drilling of the next directional well